Congratulations! Evercross Bridge successfully won the bid for two 50-meter modular steel bridges in Tanzania, leading the new industry track with its strength
Congratulations! Evercross Bridge successfully won the bid for two 50-meter modular steel bridges in Tanzania, leading the new industry track with its strength
Our company won the bid for two 50-meter modular steel bridges in Tanzania.
The load of the bridge reaches more than 100 tons, and the use environment is harsh. One end of the bridge is arranged on the pontoon, requiring the bridge and the pontoon to respond to the tidal rise and fall synchronously, and the maximum rise of the tide reaches 4.5 meters. The design and processing requirements are high. Our company's technical department simulated the load and operation of the bridge, which was affirmed by customers.

Certified

