Modular steel bridges · Factory since 2005 · Zhenjiang, China

HD200 Bailey bridge · Factory since 2005 · Zhenjiang, China

HD200 Bailey bridges and modular steel spans up to 91 m — prefabricated, container-shipped, installed in days.

Our flagship HD200 panel bridge carries heavier loads across longer spans than the standard Bailey system. Factory load-tested, packed in standard containers, launched without heavy cranes — for emergency relief, mining haul roads and rural road programmes.

HD200 flagship panel bridge 91 m single span, load tested 47,000 m² production base 10+ countries delivered
91 mMaximum single span (D-type)
47,000 m²Factory area, Zhenjiang
22,000 m²Fabrication workshop
100 tLifting capacity

Product range

Twelve bridge systems, one engineering team

From 6 m footbridges to 91 m highway spans — panels, girders and deck systems share tooling, so mixed configurations ship together.

Floating Pontoon Bridge

Floating Pontoon Bridge

Description:1.Floating pontoon bridge refers to a bridge that floats on the water surface with a boat or ponto…

Technical data →
Cable Stayed Bridge

Cable Stayed Bridge

Cable-stayed bridge, also known as diagonal bridge, is a kind of bridge where the main beam is directly pulled…

Technical data →
Steel Cable Suspension Bridge

Steel Cable Suspension Bridge

Description:A flexible suspension combination system composed of a main cable and a stiffened beam has the str…

Technical data →
Composite Beam Bridge

Composite Beam Bridge

Composite beam bridge, it refers to a composite structural beam bridge which combines steel members such as st…

Technical data →
Steel Arch Bridge

Steel Arch Bridge

The main structural form of steel arch bridgeThe upper structure of steel arch bridge is mainly composed of ar…

Technical data →
Steel Box Girder Bridge

Steel Box Girder Bridge

Instruction:The steel box-girder bridge is generally composed of top plate (bridge panel), beam web, bottom pl…

Technical data →

Capability

91 metres in a single span, proven by load test

Most modular bridge suppliers stop between 30 and 60 metres. Our D-type panel configuration carries a highway load class across 91 m without intermediate piers — validated in a full-scale load test and already in service.

The engineering consequence is simple: no pier construction, no river-bed work, no seasonal window. A crossing that would take a season becomes a two-week installation.

Load test data & drawings

ParameterValue
ConfigurationD-type modular panel
Max single span91 m
Carriageway width4.2 m (single lane) / custom
Load classHS20-44 / Class 60 custom
Panel depth2.4 m
Assembly methodCantilever launch, no crane
VerificationFull-scale load test
2005Founded
10+Delivery countries
2Production lines
ISOQuality system

Manufacturing

One factory, from steel plate to galvanised panel

Production sits in Zhenjiang, Jiangsu — 47,000 m² of site and 22,000 m² of workshop with 100 t lifting capacity, cutting, drilling, welding, hot-dip galvanising and trial assembly under one roof.

Because panels, transoms, stringers and decking are made in the same plant, a mixed-configuration order leaves on schedule instead of waiting for outsourced parts. Every shipment is trial-assembled and matched before packing.

Inside the factory →

Where we deliver

Projects across Asia, Africa and Latin America

Emergency crossings, mining haul roads, rural road programmes and temporary works — same panel system, engineered per site condition.

  • Papua New Guinea
  • Philippines
  • Malaysia
  • Myanmar
  • Laos
  • Cambodia
  • Tanzania
  • Mozambique
  • Colombia
  • Ecuador
  • Peru

Engineering notes

How bridges actually get chosen

All articles

Send span, load class and site country

You get a preliminary bridge layout, panel quantity, container count and a budget range — normally within 24 hours.

Request a quote