The Tanzanian delegation visited our factory to observe the load test of the prefabricated steel bridge

The CD-type prefabricated highway steel bridge exported to Tanzania completed load testing in the factory under the witness by customer representatives and professional engineers from Bureau Veritas. Two heavy trucks in a row go up the bridge at the same time. The bridge performed well in all indicators, demonstrating the advantages of the CD-type modular bridge in large-load and large-span usage scenarios, and received high praise from customers.




Certified
