Successful Delivery of 33m HD200 Modular Steel Bridge in Philippines

Recently, EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO., LTD. has achieved a new milestone in overseas infrastructure projects. The 33-meter single-span HD200 modular Bailey steel bridge located in Barangay Bundagul, Mabalacat City, Pampanga, Philippines, was successfully completed and delivered within only 10 working days. The project has won high recognition from the client for its reliable engineering quality and professional on-site technical services.
As a single-span and pier-free temporary construction bridge, the project features a clear span of 33 meters with no intermediate support piers, delivering a streamlined and stable structural performance. Strictly designed in accordance with Philippine DPWH specifications and AASHTO LRFD international bridge design standards, the bridge adopts HS20-44 heavy load grade, fully complying with local heavy engineering vehicle load requirements and meeting both local official codes and global high-standard bridge design criteria.
Serving as a ey backbone temporary bridge for local infrastructure construction, it is specially built for cross-river transportation of heavy construction machinery, engineering materials and equipment. The bridge completely solves the river crossing obstruction problem during regional foundation construction, unblocks the core transportation channel, and provides solid traffic guarantee for the smooth progress of large-scale local infrastructure projects.
Considering the local tropical monsoon climate with high temperature, high humidity, frequent rainfall and typhoons that easily cause steel corrosion and construction difficulties, our technical team optimized the structural design and anti-corrosion system in advance. The overall steel structure is upgraded with enhanced wind resistance, seismic resistance and anti-corrosion performance to adapt to the harsh local natural environment and ensure long-term safe operation.
During the whole construction period, our professional senior engineers were stationed on-site to provide full-process technical guidance, including modular assembly, precision calibration, load verification and construction quality control. We standardized the operation of local construction teams and avoided various construction risks in tropical environments. The full completion within 10 days fully demonstrates the core advantages of HD200 Bailey bridge: modularization, rapid erection, stable structure and strong adaptability.
The successful delivery of this project effectively breaks the regional traffic bottleneck for infrastructure construction in Mabalacat City, greatly improves local engineering efficiency and reduces construction and transportation costs. It provides a reliable temporary traffic solution for subsequent local infrastructure upgrading and lays a solid foundation for regional economic and infrastructure development.
Furthermore, this benchmark project further consolidates EVERCROSS’s brand influence in the Philippines and Southeast Asian steel bridge market. Adhering to international standard design, rapid delivery capability, customized engineering solutions and comprehensive after-sales technical support, we will continue to deepen the Philippine market. We will continuously supply high-quality, standard-compliant modular steel bridge products and one-stop engineering solutions, actively participate in Southeast Asian infrastructure construction, expand global market layout, and establish a high-end brand image of Chinese exported steel bridges.

Certified
